Tournafulla

  • Category: Renewable
  • Energy type: Onshore wind
  • Project type: Asset

Airtricity began construction of this 18 turbine site in April 2006.

The wind farm was constructed in two phases. Phase 1 consisted of 5 turbines with a 38kV overhead line grid connection. Phase 2 consisted of a further 13 turbines with an installed capacity of 19.5MW.